Welcome guest, is this your first visit? Click the "Create Account" button now to join.

To disable ads, please log-in.

Shop at TeamEstrogen.com for women's cycling apparel.

Results 1 to 15 of 22

Hybrid View

  1. #1
    Join Date
    Jul 2007
    Posts
    185
    I had to go outside and through my basement level garage so I could climb a ladder from the basement to my wall-mounted microwave on the first floor for 2 months until we finally had a floor.
    2008 Specialized Globe Sport
    2009 Specialized Sequoia Elite

  2. #2
    Join Date
    May 2008
    Location
    northern Virginia
    Posts
    5,897
    Quote Originally Posted by FlyingScot View Post
    I had to go outside and through my basement level garage so I could climb a ladder from the basement to my wall-mounted microwave on the first floor for 2 months until we finally had a floor.
    I think you win.

    - Gray 2010 carbon WSD road bike, Rivet Independence saddle
    - Red hardtail 26" aluminum mountain bike, Bontrager Evoke WSD saddle
    - Royal blue 2018 aluminum gravel bike, Rivet Pearl saddle

    Gone but not forgotten:
    - Silver 2003 aluminum road bike
    - Two awesome worn out Juliana saddles

  3. #3
    Join Date
    May 2008
    Location
    northern Virginia
    Posts
    5,897
    I took a bazillion photos to show the work that was done every day. Of course I haven't uploaded them all yet. I'll try to work on that soon.

    But I will say, for all the hassle, it was so worth it.

    - Gray 2010 carbon WSD road bike, Rivet Independence saddle
    - Red hardtail 26" aluminum mountain bike, Bontrager Evoke WSD saddle
    - Royal blue 2018 aluminum gravel bike, Rivet Pearl saddle

    Gone but not forgotten:
    - Silver 2003 aluminum road bike
    - Two awesome worn out Juliana saddles

  4. #4
    Join Date
    Apr 2008
    Posts
    3,176
    I'm buried in it now.

    One tiny scratch in the surface dreck revealed a complete disaster, complete with burned and rotten flooring and mysterious/hazardous wiring. Not sure when we're going to even move in, let alone have a finished kitchen. At least we still can watch the TdF at the old place.



    I wonder: does remodeling have its own patron saint or do we go straight to St. Jude?
    Each day is a gift, that's why it is called the present.

  5. #5
    Join Date
    Jan 2002
    Location
    On my bike
    Posts
    2,505
    Quote Originally Posted by malkin View Post

    I wonder: does remodeling have its own patron saint or do we go straight to St. Jude?
    I'm thinking straight to the Virgin Mary. She's a woman - she'll understand.
    To train a dog, you must be more interesting than dirt.

    Trek Project One
    Trek FX 7.4 Hybrid

  6. #6
    Join Date
    Jan 2002
    Location
    On my bike
    Posts
    2,505

    Amazing!!

    Eleven cabinets, one corner turntable thingie (love it!!), a bunch of drawers, a cabinet that has sliding shelves - in 1.5 days!!! That's demo of the old stuff including countertops & installation of cabinets!! Now - where to put everything??

    Waiting for final measuring of countertops so they can install corian. No water because corian will include the sink. Then installation of new stove & microwave and repair of tile. So, still doing dishes in bathroom sink & no microwave but at least the stove is hooked up & we put old shelving over the new cabinets to make a temporary counter.

    I used a local company known for its upscale work. Heard too many horror stories about Home Depot, Lowe's, etc. I wanted to be able to grab the owner by the throat if necessary. These people aren't cheap and I had to wait 1 month for the cabinets to be made, but so far, so good.
    To train a dog, you must be more interesting than dirt.

    Trek Project One
    Trek FX 7.4 Hybrid

  7. #7
    Join Date
    Feb 2005
    Location
    Concord, MA
    Posts
    13,394
    We did a major kitchen remodel after moving into this house and it went exactly as planned. They said 6 wks. and it took 5. We set up a microwave and burner on the table (we have a separate eating area) and put the fridge in the dining room. Bought lots of paper plates and prepared foods from the grocery store. I did have to wash things in the bathtub, upstairs, but right when we got sick of it, it was over. I am a super neat freak, too, but there was not much you could do about the dust. Our family room and bedroom are on a different level, so that helped. Not all construction is a nightmare. The same people did a gut job and remodel of our master bath and there was only one glitch, not their fault when the guy who they hired to do some work on the hard wood floor didn't come when he was supposed to. However, DH was able to be at home for most of the work and he really knows about this stuff. Me, I looked at the plans and said fine to something in the bathroom, and I ended up not liking it. I don't have the patience to deal with the details or planning of this stuff. I like nice things, but I know nothing about house stuff, to the point that after 31 years, this is the first time I participated in any buying, remodeling decisions, except for furniture. I mean, i made the decision about which house to buy for all of the moves, but not the carpets, floor, window treatments, landscaping. I find this stuff to be boring; maybe I didn't get the female gene here?
    Last edited by Crankin; 07-07-2011 at 05:02 AM.
    2015 Trek Silque SSL
    Specialized Oura

    2011 Guru Praemio
    Specialized Oura
    2017 Specialized Ariel Sport

 

 

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •