July 8 Alameda Creek Trail ride: The Details
Hello gang - the big day draws near!!
July 8 (Saturday) - 8:45 - 9:00 am (meeting time)
and let's try to start riding by 9:15 or so.
The route: It is 11 miles flat out to the the end, an optional 3 mile loop with rolling hills, and an additional totally optional hill (the infamous "Jobob's nemesis" hill - see description in the other thread
) then 11 flat miles (possibly with a tail wind
) back to the start.
Since we will have some beginners with us, and some folks on mountain bikes, we might end up splitting into groups. If at any point anyone wants to shorten the route, there are shady little rest areas and picnic benches every few miles along the way.
Maybe afterwards, we can caravan or ride up to the Mission Coffee shop for smoothies or lunch??? That was so fun last time!
Here are Jobob's excellent directions from last time:

Originally Posted by
Jobob
Here is a link to a Google map of the location of he Niles Canyon staging area, with a small parking lot, picnic benches and porta-potties.
http://maps.google.com/maps?f=q&hl=e...04884,0.107803
The general location is 700 Old Canyon Rd Fremont, CA 94536 if you want to map-quest directions.
*** Bring emergency notification/ID, snacks, water, sunblock, spare tubes, etc. ***
Any other riders? Any word on our Maybes?
Oh - if anyone would like my cell phone number for last minute coordination, please PM me and I'll be happy to provide it.
(Slinke - I'm moving you to the defnites! Yay!)
Last edited by bikerz; 07-06-2006 at 08:33 AM.
Keep calm and carry on...