Mine also took 2 months, vs. the 3-week estimate before we started. Cabinets were damaged in shipping, some by water in the truck and some just broken. Most of the damage was to base cabinets, so that delayed the counter top measuring. Then there was a 2-week delay between measuring for counters and installing them, and another week delay for the floor installation, because by the time all the other delays were done the floor guy had another big job he had to do first.
I still have a few boxes of kitchen stuff in my bedroom. Also one of the cabinet doors needs to be replaced, because it's damaged. I just haven't had the energy to deal with it.
But, it looks really good now.
- Gray 2010 carbon WSD road bike, Rivet Independence saddle
- Red hardtail 26" aluminum mountain bike, Bontrager Evoke WSD saddle
- Royal blue 2018 aluminum gravel bike, Rivet Pearl saddle
Gone but not forgotten:
- Silver 2003 aluminum road bike
- Two awesome worn out Juliana saddles