I'm working on a route similar to the one that I posted, possibly including a portion of Laguna Canyon Rd (from El Toro Rd.) and PCH up to Newport Coast (so Tracy can do it the other way) which would take us up to approximately 56 miles. I think that an optional loop of Back Bay will finish the day for those who want to do a metric.
Tiffanie and I will preview the ride on the 20th, since that's the day we're scheduled to do a metric anyway and I'll scout out someplace to stop and eat in Mission Viejo. It's looking like this ride will have 4000+ feet of climbing, just FYI.
ETA: Tiff just sent me the Back Bay map and it adds about 9 miles, so it will be an option at the end of the ride for those who want to continue on.



) which would take us up to approximately 56 miles. I think that an optional loop of Back Bay will finish the day for those who want to do a metric.
Reply With Quote