Quote Originally Posted by bmccasland View Post
Dear Project Team and in particular Project Manager,
Why do you NOT get the concept that I need a correct set of project plans for my water quality submittal package?? A project feature was added that will driectly affect surface hydrology, so it is applicable for the WATER quality permit.
The fact that the permit application is going out late is because you keep adding features. I need to submit what we're planning on building. You make changes, the application needs to change, thus causing the schedule to slip.

Ugh! I hate that. Not from an engineering standpoint for me, but in a lot of projects I worked on in a previous job, every time someone would get a "great idea" they'd want to include it. If I put my foot down, I was being insubordinate. If I included it, the project would get backlogged. Design by Committee is the Worst Thing Ever.