At this point the van is about 90% done. Stove, sink, fridge and bed are in place. We are still working on getting covers made for the cushions on the bench and curtains.
At this point the van is about 90% done. Stove, sink, fridge and bed are in place. We are still working on getting covers made for the cushions on the bench and curtains.
Living life like there's no tomorrow.
http://gorgebikefitter.com/
2007 Look Dura Ace
2010 Custom Tonic cross with discs, SRAM
2012 Moots YBB 2 x 10 Shimano XTR
2014 Soma B-Side SS