
Originally Posted by
feral1
Uggggg we lost our power at 10:30pm on Sat and just got it back today(Friday) at 11am.......really it's takes 6 days to do 1 hour worth of work??
Yes, if the utility damage is extensive. Crews are overworked and infrastructure can be damaged. Sometimes with massive outages, large sections of the grid have to be connected and tested before areas can start being turned back on. Ice storms and heavy wet storms are notorious for this kind of damage: be prepared.
2015 Liv Intrigue 2
Pro Mongoose Titanium Singlespeed
2012 Trek Madone 4.6 Compact SRAM