Mine also took 2 months, vs. the 3-week estimate before we started. Cabinets were damaged in shipping, some by water in the truck and some just broken. Most of the damage was to base cabinets, so that delayed the counter top measuring. Then there was a 2-week delay between measuring for counters and installing them, and another week delay for the floor installation, because by the time all the other delays were done the floor guy had another big job he had to do first.

I still have a few boxes of kitchen stuff in my bedroom. Also one of the cabinet doors needs to be replaced, because it's damaged. I just haven't had the energy to deal with it.

But, it looks really good now.