Even if they did have a 'bot part of the challenge in addition to the quake, tsunami damage the power is out .... at the power plant. So nothing to plug the 'bot intoor anything else they've needed to solve the problem traditional ways.
I hear they got power back at least one of the 4 damaged plants. Now to hope the lines, infrastructure etc inside the plants still work.![]()





or anything else they've needed to solve the problem traditional ways.
Reply With Quote