Welcome guest, is this your first visit? Click the "Create Account" button now to join.

To disable ads, please log-in.

Shop at TeamEstrogen.com for women's cycling apparel.

Results 1 to 15 of 290

Hybrid View

  1. #1
    Join Date
    Nov 2005
    Location
    Between the Blue Ridge and the Chesapeake Bay
    Posts
    5,203
    I think it's getting close to ending. At least the big stuff. Gotta be. There's no big stuff left to do! And I'm broke!

    Painting is done, to complement the new roof, new water heater, new HVAC, new electricity, new plumbing, window repair...

    some before and after shots.
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	front porch.jpg 
Views:	311 
Size:	71.7 KB 
ID:	12195   Click image for larger version. 

Name:	101031 house.jpg 
Views:	323 
Size:	96.1 KB 
ID:	12196   Click image for larger version. 

Name:	101031 4600.jpg 
Views:	305 
Size:	112.0 KB 
ID:	12197   Click image for larger version. 

Name:	101031 windows.jpg 
Views:	312 
Size:	130.9 KB 
ID:	12198  

  2. #2
    Join Date
    Nov 2005
    Location
    Between the Blue Ridge and the Chesapeake Bay
    Posts
    5,203
    And the interior...whew!
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	kitchen before.jpg 
Views:	333 
Size:	30.3 KB 
ID:	12199   Click image for larger version. 

Name:	kitchen Sept09.jpg 
Views:	330 
Size:	48.6 KB 
ID:	12200  

  3. #3
    Join Date
    Feb 2005
    Location
    Concord, MA
    Posts
    13,394
    Looks beautiful, Tulip. Time to take a rest!
    I empathize. We took a year off from the big projects you describe. We've done almost all of them. Until we bit the bullet and had our driveway repaved, along with totally re-doing the garage floor, which had a huge crack.
    I hated to spend the $, but now, as winter approaches, no more frost heaves, puddles, and large pools of ice that made my friends not want to come visit.
    Except they made the annoying hill going away from the house a bit steeper!
    2015 Trek Silque SSL
    Specialized Oura

    2011 Guru Praemio
    Specialized Oura
    2017 Specialized Ariel Sport

  4. #4
    Join Date
    Oct 2007
    Location
    MD
    Posts
    1,626
    I love this thread! I'll have to add to it once I find some good before pictures. I had some work I was planning that I wanted to do, then I had a flooded out first floor thanks to a ruptured hose to the washing machine, which led to lots of work I hadn't planned on. The after pics will be better with the before pics to compare them to.

  5. #5
    Join Date
    Jul 2003
    Location
    Traveling Nomad
    Posts
    6,763
    What a darling house, tulip. I love it! You've done a beautiful job.
    Emily

    2011 Jamis Dakar XC "Toto" - Selle Italia Ldy Gel Flow
    2007 Trek Pilot 5.0 WSD "Gloria" - Selle Italia Diva Gel Flow
    2004 Bike Friday Petite Pocket Crusoe - Selle Italia Diva Gel Flow

  6. #6
    Join Date
    Nov 2002
    Location
    the dry side
    Posts
    4,365
    Quote Originally Posted by emily_in_nc View Post
    What a darling house, tulip. I love it! You've done a beautiful job.
    yes very cute!!!
    2015 Liv Intrigue 2
    Pro Mongoose Titanium Singlespeed
    2012 Trek Madone 4.6 Compact SRAM

  7. #7
    Join Date
    Nov 2002
    Location
    the dry side
    Posts
    4,365
    So we did our master bath this winter. It was the original 1979 icky contractor stuff, no ventilation, so we called this bathroom "the cave" prior to the work. We also redid the dressing area with new counter top, sink, fixtures. Carpet in about two weeks...


    Almost done, just have to add the doors


    detail of glass accent before grout



    Door out to hot tub...

    Last edited by Irulan; 11-01-2010 at 06:15 PM.
    2015 Liv Intrigue 2
    Pro Mongoose Titanium Singlespeed
    2012 Trek Madone 4.6 Compact SRAM

 

 

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •