I saw it, I touched it, I held it
Look. Look. Here it is. Isn't it gorgeous? My raw frame, about ready for the paint shop. The black strips are electrical tape over the S&S couplers to keep grit out when the frame is cleaned before painting. Now it just needs the braze-ons for the racks, which he is going to do tomorrow. I saw the racks too - very nice, light, stainless steel Tubus racks. oooh. ahhh.
I test road 2 bikes, one with bar end shifters, one with STI. Decided I prefer the bar-ends. Spent about 2 hours with Peter Mooney talking about components. Just about everything is set. He's got rims for my 26 inch wheels but has to order the hubs. And I saw the 26x1.3 tires he recommended and liked them. The frame has plenty of clearance for those tires and fenders too (fender braze-ons are already installed). I'll probably look for 650c rims elsewhere. I've got a Dura Ace 9-speed 28 hole rear hub for the 650s. Felt some Shimano brake levers (not STI) that I liked. I double-checked my paint choice, a metallic blue, and picked silver decals edged with white. The bike should be ready to ride by early May. I may be hyperventilating until then.
Oil is good, grease is better.
2007 Peter Mooney w/S&S couplers/Terry Butterfly
1993 Bridgestone MB-3/Avocet O2 Air 40W
1980 Columbus Frame with 1970 Campy parts
1954 Raleigh 3-speed/Brooks B72