Originally Posted by
TrekDianna
I am so tired of home remodeling also. I am working remotely at my vacation house while every floor in my other house has been ripped out (good riddance to the pink carpet). I was going to stay there, but after I stepped on a nail and needed a tetnus booster, I came to the other house. If I had a bit of forethought, I would have scheduled this while i was on vacation out of the country for a month this summer.
I only have one house and one bathroom. I want to be here for the bathroom renovation so I can be involved with the details and keep an eye on things. So I need to find out how many days it will be totally unusable (no toilet) and find a hotel or friend to stay with on those days.
As for the new floor, they say they can be finished in a day. The challenge there is piling as much in the kitchen as possible to minimize the things the installers have to move around in the rooms where they are working. I even have to get everything off the closet floors. This is where having fewer bikes is a good thing -- I can put the mountain bike out on the balcony and store the road bike in my car.
- Gray 2010 carbon WSD road bike, Rivet Independence saddle
- Red hardtail 26" aluminum mountain bike, Bontrager Evoke WSD saddle
- Royal blue 2018 aluminum gravel bike, Rivet Pearl saddle
Gone but not forgotten:
- Silver 2003 aluminum road bike
- Two awesome worn out Juliana saddles